//]]>
Item type | Location | Call Number | Status | Notes | Date Due |
---|---|---|---|---|---|
Book | AUM Main Library | 658.4013 S634 (Browse Shelf) | Available | JBC/2011/16930 | |
Book | AUM Main Library | 658.4013 S634 (Browse Shelf) | Available | JBC/2011/16930 |
"A Productivity Press book."
Includes bibliographical references (p. 233-235) and index.
The lean, six sigma, and theory of constraints (TOC) : improvement cycles -- Introducing the ultimate improvement cycle (UIC) -- The value stream, a scheduling system, and performance metrics -- Finding waste in the constraint -- Reducing variation and defects -- Exploiting the current constraint -- Reducing waste and variation in the current constraint -- Subordinating nonconstraints to the current constraint -- Line balancing and flow optimization -- Optimizing the constraint buffer and pulling in the nonconstraints -- Elevating the constraint and implementing protective controls -- Breaking the current constraint -- Sustaining the gains with protective controls -- System constraints and problems -- Establishing the environment for change.
There are no comments for this item.